With countless jobs to complete and the clock ticking relentlessly, the Dean garage is rather like a pressure cooker. So, will it blow or will it be a final cruise over the finish line?

Final adjustment of nose prior to bonnet fitment

 

Aligning bonnet with nose

 

Drilling holes for bonnet clips

 

Fitting bonnet catch

 

High pressure fuell regulator and stainless overbraid hoses

 

Neatly routed with billet alloy clamps

 

Using the induction gasket to determine size of hole required in bonnet

 

Template production to avoid a costly mistake

 

Big hole!!

 

Air flow sensor joined to ACT plenum by Samco hose

 

All finished.... makes a statement

 

Coolant pipes fabricated

 

Getting rather crowded in here

 

Connecting heater..... yep, she even has a heater

 

Trial fitting of the seats

 

Centre tunnel carpet glued into position

 

The ultimate seatbelts from Sabelt

 

Covering dash with foam prior to trimming

 

Next the leather cloth

 

Making the holes in the trim for the intruments

 

Top quality microprocessor controlled instruments from Speed Hut in the States; notice my signature on the faces

 

Toggle switch guards from Car Builder Solutions

 

Dash ready to be bolted into place.